Rotating Images
Rotating Images
Rotating Images

Phase III Construction Engineering Services


Owner:
Illinois Department of Transportation, Illinois State Toll Highway Authority, Cook County Highway Department, and Chicago Department of Transportation.
Location: District 1, District 3, and District 4, IL

IEI was retained by the various owners to provide Phase III construction engineering services for various projects throughout Illinois. The scope of work included construction inspection, reviewing and providing construction layouts, quality assurance oversight, preparing records, maintaining documentation, submitting pay estimates and change orders, submitting final contract documents and as-built drawings for construction work to be performed by the contractor on various construction projects as assigned.


Projects undertaken for Illinois Department of Transportation include the following:

  • Wisconsin State Line to Illinois Route 173 Intersection Reconstruction
  • Flint Creek Bridge Repair on Illinois Route 14
  • Illinois Route 43 Over the North Branch of the Chicago River
  • Sheridan Road Bridge Over Middleton Ravine and Sheridan Bridge Over Bovington Ravine
  • Illinois 137 Bridge Over Peterson Road, Lake County, Illinois


Projects undertaken for Illinois State Toll Highway Authority include the following:

  • I-294 Willow Road to Dempster
  • I-355 North/South Extension
  • I-88 Dekalb to Dixon
  • ISTHA Epoxy Pavement Marking - Systemwide
  • East-West Tollway Intermittent Pavement Repairs Mile Post 127.9 to Mile Post 138.0
  • Tri-State Tollway Intermittent Pavement Repairs Mile Post 25.2 (Hinsdale Oasis), Mile Posts 26.8 (47th Street) to Mile Post 29.0 (31st Street), Mile Post 38.7 (Irving Park Road)
  • Tri-State Tollway Retaining Wall and Culvert Rehabilitation Mile Post 74.4 to 77.2


Projects undertaken for Cook County Highway Department include the following:

  • Vincennes Avenue from 119th Street to 103rd Street
  • Rehabilitation of Martin Luther King Jr. Drive (103rd to 115th Street) and State Street (115th to 119th Street)
  • Martin Luther King Drive - Phase 3 Improvements from 103rd Street to 79th Street
  • North Frontage Road Resurfacing
  • Euclid/West Lake Avenue from Wolf Road to Milwaukee Avenue
  • Dempster/Thacker Street Reconstruction
  • South Frontage Road (Battan Drive) from 25th Avenue to 1st Avenue
  • East River Road at Ballard Road Intersection Improvements
  • Eisenhower Expressway North Frontage Road