Infrastructure Engineering, Inc.

  • Services
    • Design Engineering
    • Transportation
    • Bridges/Structural
    • Site/Civil
    • Water Management
    • Construction Engineering & Inspection
    • Program Management
  • Portfolio
  • News
    • IEI REMAINS COMMITTED TO EMPLOYEE HEALTH AND SAFETY
  • About
    • Our History
    • Our Team
    • Community Support
    • Mission, Vision, Core Values
  • Careers
    • Employment
    • Internships
  • Connect
    • Chicago
    • Indianapolis
    • Peoria
    • New York
Cedar Street Extension Study

Cedar Street Extension Study

East of the Illinois River in East Peoria, IL, the Cedar Street Extension (Illinois Route 8/Illinois Route 116) crosses over the Peoria and Pekin Union (P&PU) Railroad and Illinois Route 29 via two bridges which were constructed in 1963.  The Illinois Department of Transportation (IDOT) initiated a study of the bridges to determine if they should be removed and replaced or rehabilitated.

Infrastructure Engineering Inc. (IEI) provided Phase I and II engineering services including the preparation of a Project Report; Bridge Condition Report; intersection design studies; public involvement activities and contract plans; plans, specifications and estimate (PS&E) for the Cedar Street Extension structures and roadway approaches.

Services

  • Roadway/Highway
  • Bridges/Structural
  • Civil Site

Owner

Illinois Department of Transportation

Additional Images

Back to Portfolio
Back to Top
Office Locations
ChicagoIndianapolisPeoriaNew York
Privacy Terms of Use Disclaimer Employee Links info@infrastructure-eng.com
© 2021 Infrastructure Engineering, Inc.
Website Designed by Chicago’s ePageCity.com